Locations where quality is created.

With 1000 employees, CREATON manufactures at seven locations in Germany.

factories for clay roof tiles

CREATON factory Großengottern

Großengottern/Thuringia

CREATON factory Großengottern

Most modern and largest production facility for large pantiles
The central location in the heart of Germany is Grossengottern/ Thuringia with its high-tech centre for large pantiles. The “Rote Berg” raw material source lauded by experts is located here. Plants I and II at the largest facility in the CREATON family of brands produce approx. 33 million „FUTURA“, „SINFONIE“ and „DOMINO“ model clay roof tiles annually.

Directions:
Wertinger Weg 1
D-99991 Grossengottern,
Germany
Tel.: +49 (0) 3 60 22 / 93-0

Shipping availability:
Monday to Friday: 7.00 a.m. - 5.00 p.m.

Loading yard opening hours:
Winter (December 1 - March 31) 7.00 a.m. - 4.00 p.m.
Summer (April 1 - November 30): 7.00 a.m. - 5.00 p.m.

Loading information:
Last truck admitted 1/2 hour before end of business. Special cases or different loading times will be handled flexibly, as before. Please coordinate directly with the dispatch centres, if necessary.

CREATON factory Guttau

Guttau/Saxony

CREATON factory Guttau

Location of the highly innovative KERALIS quality production 
The Guttau location plays an important strategic role as the “Eastern Bridgehead”. Completely new dimensions in product quality are achieved here due to unique processing and an innovative firing process. The completely through-coloured „PREMION“ and "CANTUS" tile models are produced in Guttau using the „KERALIS“ process.

Directions:
Baruther Strasse 18
D-02694 Malschwitz,
Germany
Tel.: +49 (0) 3 59 32 / 34-0

Shipping availability:
Monday to Friday: 7.00 a.m. - 5.00 p.m.

Loading yard opening hours:
Winter (December 1 - March 31) 7.00 a.m. - 4.00 p.m.
Summer (April 1 - November 30): 7.00 a.m. - 5.00 p.m.

Loading information:
Last truck admitted 1/2 hour before end of business. Special cases or different loading times will be handled flexibly, as before. Please coordinate directly with the dispatch centres, if necessary.

CREATON factory Höngeda

Höngeda/Thuringia

CREATON factory Höngeda

Productiefaciliteit voor innovatieve geperste dakpannen
Jaarlijks worden hier ca. 20 miljoen geperste dakpannen  „TERRA OPTIMA“, „MIKADO“ and „RATIO“ geproduceerd.

Adres:
Landstrasse 135-138
D-99998 Weinbergen/Höngeda,
Duitsland
Tel.: +49 (0) 36 01 / 4 96-0

Bereikbaarheid:
Maandag tot vrijdag: 7u00 – 17u00.

Ophaling:
Winter (december 1 - maart 31) 7u00 – 16u00.
Zomer (april 1 - november 30): 7u00 – 17u00.

Laadinformatie:
Laatste vrachtwagen toegelaten, een half uur voor sluitingsuur. Zoals steeds het geval is geweest, worden speciale gevallen of afwijkende laadtijden flexibel behandeld. Indien nodig kan er rechtstreeks contact worden opgenomen met de verzendingscentra.

CREATON factory Malsch

Malsch/Baden-Wurttemberg

CREATON factory Malsch

Production facility for innovative pressed roof tiles
CREATON AG took over TROST Dachkeramik GmbH & Co. KG in Malsch (near Heidelberg) in April 2008. TROST invested about 80 million euros after 1997 in the building and state-of-the-art equipment at the Malsch roof tile plants, which now have a production capacity of approx. 2 million m2 of roof area per year. This state-of-the-art facility meets CREATON quality standards in every respect. The CREATON brand programme will be further complemented by the TROST „MAXIMA“, „GALANT“ and „VIVA“ products.

Directions:
An der B 3
D-69254 Malsch,
Germany
Tel.: +49 (0) 72 53 / 2 08-0

Shipping availability:
Monday to Friday: 7.00 a.m. - 5.00 p.m.

Loading yard opening hours:
Winter (December 1 - March 31) 7.00 a.m. - 4.00 p.m.
Summer (April 1 - November 30): 7.00 a.m. - 5.00 p.m.

Loading information:
Last truck admitted 1/2 hour before end of business. Special cases or different loading times will be handled flexibly, as before. Please coordinate directly with the dispatch centres, if necessary.

CREATON factory Wertingen

Wertingen/Bavaria

CREATON factory Wertingen

Administrative headquarters of the entire company
Clay roof tiles have been produced at the traditional "Berchtold" facility in Wertingen since 1884. Approx. 20 million pressed roof tiles in the form of the „MELODIE“, „HARMONIE“, „ELEGANZ“ and „HERZZIEGEL“ models are produced at this location which is also the CREATON administrative headquarters. After a catastrophic fire in May 2007, the entire plant was renovated, redesigned and developed into one of the most modern clay roof tile facilities in Europe with a total investment of 26 million euros.

Directions:
Dillinger Strasse 60 
86637 Wertingen 
Germany 
Telephone: +49 (0) 82 72 / 86-0 

Shipping availability:
Monday to Friday: 7.00 a.m. - 5.00 p.m.

Loading yard opening hours:
Winter (December 1 - March 31) 7.00 a.m. - 4.00 p.m.
Summer (April 1 - November 30): 7.00 a.m. - 5.00 p.m.

Loading information:
Last truck admitted 1/2 hour before end of business. Special cases or different loading times will be handled flexibly, as before. Please coordinate directly with the dispatch centres, if necessary.

factories for concrete roof tiles

Neuburg/Bavaria

Location for concrete tile production
...

Directions:
Spreestraße 1
D-86633 Neuburg an der Donau
Tel.: +49 (0) 6224 701 0


Shipping availability:
Monday to Friday: 7.00 a.m. - 5.00 p.m.

Loading yard opening hours:
Winter (December 1 - March 31) 7.00 a.m. - 4.00 p.m.
Summer (April 1 - November 30): 7.00 a.m. - 5.00 p.m.

Loading information:
Last truck admitted 1/2 hour before end of business. Special cases or different loading times will be handled flexibly, as before. Please coordinate directly with the dispatch centres, if necessary.